tailieunhanh - Wind Farm Impact in Power System and Alternatives to Improve the Integration Part 13

Tham khảo tài liệu 'wind farm impact in power system and alternatives to improve the integration part 13', kỹ thuật - công nghệ, cơ khí - chế tạo máy phục vụ nhu cầu học tập, nghiên cứu và làm việc hiệu quả | A Holistic Approach for Wind Farm Site Selection by Using FAHP 229 Fig. 4. Priority weights of each factor for the alternatives Social factors lead to selection of Karaman as most appropriate site for wind farm project. Expectation of society to become a developed city results in the acceptance of such an energy production project which is already does not cause serious environmental problems. In addition there is no alternative beneficial use for the land and residential area is far away from the site. Same reasons are valid for Izmir which has about the same priority number with Karaman. For Mugla public acceptance and alternative land uses are critical. Mugla has a thermal power plant and against to the further projects around the region. Istanbul is certainly the least preferred site due to social factors. High potential of being an industrial zone bring the alternative land use in the foreground and public acceptance become restricted due to both alternative land use and environmental impacts. Also being a dense residential area is a big disadvantage that cannot be tolerable in any way. Izmir is a distinguished alternative from technical points of view. Average wind speed is higher than the other sites and there is a close grid in the site serving for another wind farm. Therefore its turbine size is small as possible as due to high wind speed and there is no restriction about the suppliers. Land topography and geology is relatively make it hard to construct a wind farm however it can be overcome relatively easier due to existing experiences about wind farm construction in the site. 230 Wind Farm - Technical Regulations Potential Estimation and Siting Assessment Istanbul Mugla and Karaman have almost the same priority number for technical factors which are and respectively. Although average wind speed is relatively high in Karaman and there is no debate about turbine size due to large available area long distance between wind farm and .

TỪ KHÓA LIÊN QUAN