tailieunhanh - Storm Water Pollution Prevention Plan

Preconstruction planning should be used to sequence major grading activities to minimize the exposure time of graded or denuded areas. The erosion prevention and sediment control measures and/or plans shall be modified as necessary so that they are effective at all times throughout the course of the project. The Operator will be responsible for the implementation and execution of all storm water runoff controls. Pre-construction ground cover will not be destroyed, removed, or disturbed more than 10 days prior to grading or earth moving unless the area is seeded and/or mulched or other temporary cover is. | tdQt Storm Water Pollution Prevention Plan Tennessee Department of Environment and Conservation General NPDES Permit for Discharges of Storm Water Associated with Construction Activities Permit No. TNR100000 Part . Storm Water Pollution Prevention Plan SWPPP Project No. 84063-1404-94 BRZE-8400 36 PIN Project Name Bucksnort Road Bridge over Mathis Creek @ L. M. Tipton County Tennessee Prepared for Tennessee Department of Transportation - TDOT Prepared by AMEC Earth Environmental 3800 Ezell Road Nashville Tennessee 37211 615 333-0630 Consultant Reference No. 351600020 TABLE OF CONTENTS General Site Owner SITE EROSION PREVENTION AND SEDIMENT Preconstruction and During Stabilization Structural and Non-Structural Clearing and Culvert Grading and Final Pollutant Velocity STORM WATER Required Rainfall Monitoring Inspection .14 Documentation Areas to be Repair Modifications and i TABLE OF CONTENTS OTHER ITEMS REQUIREING Construction Waste Other Non-Storm Water REQUIREMENTS FOR PLANS AND Keeping SWPPP Making Plans Notice of Retention of Tables 1. Runoff Curve Number for Existing Conditions 2. Runoff Curve Number for Post-Construction Conditions 3. Outfall Information 4. Wetland Location Figures 1. Site Topographic Map 2. Vicinity Location Map .

TÀI LIỆU MỚI ĐĂNG
54    148    1    24-12-2024
64    132    0    24-12-2024