tailieunhanh - Design of irrigation network of the IGKV farm, raipur, Chhattisgarh, India

4 Lift Irrigation Schemes (LIS) were proposed in the study to utilize the available flows in the rivulet during Kharif period and also during the initial phase of Rabi crop. Besides this surface water utilization was proposed to be increased by repair and maintenance of the existing diversion canal of Bharri Dam. Peak carrying capacity of the diversion canal was worked out to be 85 lps and the irrigation command of it is ha. It was found that there are 42 no. of bore wells in which 32 is working and 10 bore wells is not working. The average discharge and water level fluctuation for 5 year period was found to be lps and m respectively. The potential of water resources was estimated. The available surface water and ground water during study period was found MCM and . | Design of irrigation network of the IGKV farm raipur Chhattisgarh India

crossorigin="anonymous">
Đã phát hiện trình chặn quảng cáo AdBlock
Trang web này phụ thuộc vào doanh thu từ số lần hiển thị quảng cáo để tồn tại. Vui lòng tắt trình chặn quảng cáo của bạn hoặc tạm dừng tính năng chặn quảng cáo cho trang web này.