tailieunhanh - Coordination analysis of over current protection using ETAP software: A case study in PT indocement Tunggal Prakarsa Tarjun, Kotabaru, South Kalimantan
The coordination of the protection of the current relay is more necessary than the others in order to occur short circuit occurs in the field. No widespread damage occurred in its electricity and existing industrial equipment. To maintain the condition of the electric power system in optimum absence, a re-study of the coordination of current relational protection in PT Indocement Tunggal Prakarsa, Tbk Plant 12. This final project will discuss coordination analysis of overcurrent relay protection at PT. | Coordination analysis of over current protection using ETAP software A case study in PT indocement Tunggal Prakarsa Tarjun Kotabaru South Kalimantan
đang nạp các trang xem trước