tailieunhanh - Technical report TR 1.1 intermediate report on DVB-NGH concept studies

This report aims at synthesizing the main achievements and results obtained within task force TF1 during the first 18 months of the ENGINES project. This report comes as a mid-term technical report for TF1 and takes part in the overall technical work of work package WP2 “System Architecture”. | Technical report TR intermediate report on DVB-NGH concept studies