tailieunhanh - Improving effectiveness of parallel machine scheduling with earliness and tardiness costs: A case study

This paper assesses the effectiveness in scheduling independent jobs with earliness/tardiness costs and variable setup times applying the Overall Equipment Effectiveness (OEE). The OEE is a common metric for measuring the manufacturing productivity. | Improving effectiveness of parallel machine scheduling with earliness and tardiness costs A case study

TÀI LIỆU MỚI ĐĂNG
54    143    1    23-11-2024