tailieunhanh - Development of an information reference system using reconstruction models of nuclear power plants

Three-dimensional (work-site) reconstruction models of dismantling fields are useful for workers to observe the conditions of dismantling field situations without visiting the actual fields. This study, based on AR and work-site reconstruction models, developed and evaluated an information reference system. The evaluation consists of questionnaires and interview surveys administered to six nuclear power plant workers who used this system, along with a scenario. | Development of an information reference system using reconstruction models of nuclear power plants

TỪ KHÓA LIÊN QUAN