tailieunhanh - Quản lý và thực hiện các dự án Microsoft SharePoint 2010 - p 20
Đảm bảo rằng các điều tra được thực hiện vào nguyên nhân của thất bại và rằng đề nghị thay đổi nền tảng SQL được đánh giá. Phân bổ nguồn lực để điều tra như vậy (ví dụ, các giao diện đội, cho dù họ là đội SQL, các đội cơ sở hạ tầng, hoặc những người khác). | 166 Chapter 10 SharePoint Configuration Management Chapter 10 The CCB coordinating with the technical authority and interfacing teams can do the following Ensure that investigations are performed into the cause of failures and that suggested changes to the SQL platform are evaluated. Allocate resources to such investigations for example the interfacing teams whether they be the SQL teams infrastructure teams or others . Determine the faults and their underlying causes. As an example the fault would be that there was not enough space on the SQL server while the cause would be insufficient planning lack of monitoring lack of governance or all three. Authorize the investigation of design changes and any necessary corrective action and monitor the effectiveness of such actions such as altering the disk type altering disk capacity or strengthening the monitoring process . Monitor the progress of these investigations. Identify reliability and significant failures. Identify maintenance problems. The Project Manager Specifies the Configuration Management Policy The project manager is responsible for defining the CM policy and the techniques to be applied on the project. If the policy deviates from that stated in the CM procedures those deviations must be defined in the SharePoint 2010 Quality Plan. Additional issues that also need to be recorded in the SharePoint 2010 Quality Plan are as follows The designated CM authorities for the project. Who is responsible for managing the process making decisions and owning SharePoint 2010 business and technical For more information on this topic see Chapter 9 SharePoint Governance. The identity of the root document or source from which all configuration status records can be traced. Normally this is the SharePoint 2010 Quality Plan. The project manager should appoint a configuration authority who will control the CM activities on behalf of the project manager. How to Apply Configuration Management in SharePoint 167 Table 10-1 lists .
đang nạp các trang xem trước