Đang chuẩn bị liên kết để tải về tài liệu:
Quy hoạch mở rộng lưới điện truyền tải có xét tiêu chuẩn an toàn N–1 và dòng công suất phản kháng

Đang chuẩn bị nút TẢI XUỐNG, xin hãy chờ

Bài viết này trình bày phương pháp quy hoạch tuyến tính nguyên thực hỗn hợp (MILP) để tối ưu hóa cấu trúc lưới điện truyền tải có xét tổn thất công suất, dòng công suất phản kháng và tiêu chuẩn an toàn N‒1. | TNU Journal of Science and Technology 228 14 132 - 141 TRANSMISSION NETWORK EXPANSION PLANNING CONSIDERING THE N 1 SECURITY CRITERIA AND REACTIVE POWER FLOWS Dam Minh Quang Pham Nang Van Nguyen Tuan Anh School of Electrical and Electronic Engineering - Hanoi University of Science and Technology ARTICLE INFO ABSTRACT Received 09 8 2023 Transmission network expansion planning TNEP is an essential study area in power systems. The TNEP problem is often developed using the direct Revised 30 10 2023 current power flow DCPF method. However this approach takes no Published 30 10 2023 account of the power loss and the effect of reactive power flows. In addition ensuring the security of power systems for a single outage of any system element known as the N 1 security criteria plays a vital role in planning and KEYWORDS operation problems. This paper presents a mixed-integer linear programming Transmission network MILP -based method with the aim of optimizing the transmission grid expansion planning TNEP topology considering power loss reactive power flows and the N 1 criteria. The adjustment technique of branch limits is deployed with a view to the Mixed-integer linear incorporation of the influence of reactive power flows. The iteration programming MILP technique is proposed to consider the N 1 criteria in the network planning Power loss process. The evaluation of the proposed method is implemented on an IEEE The N 1 security criteria 24-node transmission system in which the MILP model is solved using the CPLEX tool under GAMS programming language and the N 1 contingency Reactive power analysis is performed using POWERWORLD software. The planning results show that 19 transmission lines with a total investment of 86.7 M need to be built for the security operation of power systems according to N 1 criteria. QUY HOẠCH MỞ RỘNG LƯỚI ĐIỆN TRUYỀN TẢI CÓ XÉT TIÊU CHUẨN AN TOÀN N 1 VÀ DÕNG CÔNG SUẤT PHẢN KHÁNG Đàm Minh Quang Phạm Năng Văn Nguyễn Tuấn Anh Trường Điện Điện tử - Đại .